Background

In line with Harvey Norman CEO, Katie Page’s ‘The Last Mile’ initiative, its retail complex at Taree could no longer tolerate the current state of disrepair of its car park asphalt surface and urgently needed to enhance ‘The Last Mile’ delivery experience for their customers.

Brief

Ozy Services was briefed by Harvey Norman Property to completely rejuvenate the car park surface with asphalt and then line mark the car spaces as well as cross hatch areas requiring extra safety awareness.

Results

Ozy Services successfully;

  • Removed uneven concrete works affecting the sub-structure of the surface
  • Repaired massive structural damage to previous car park surface
  • Re-engineered plumb lines and correct levels to ensure efficient run-off from car park into stormwater drains
  • Repainted 56 car spaces and 50m of cross hatched safety areas
  • Sourced locally and engaged specialist contractors to assist this regional job
  • Completed all works over 4 nights

Next ShowCase

Ram Raid Repairs – HN Fyshwick Background Harvey Norman owns and manages a large retail complex in Fyshwick, a light industrial suburb, south-east of Canberra, ACT. In July 2019, two men used a vehicle to conduct a ram raid on the Home Appliances retail department of the Harvey Norman complex and as a result the building had sustained significant damage and property had been stolen.
Homemaker Centre Bendigo Harvey Norman Property is the landlord of the Bendigo Homemaker Centre in regional Victoria. Over time, heavy rains caused erosion and partial collapse of the earthen bank along three sides of its property border, creating a potential erosion hazard as well as the obvious WHS issue to the roadway, assets and people below. Ozy Services was briefed by Harvey Norman Property to scrape the loose soil from the embankment; to stabilise the 60° slope with an application of geotextile matting; to excavate and construct an agricultural drain with a sock and pipework at the base of the slope; then to design and construct a light retaining wall to run the full 500 metres of the bank to contain any further erosion.
Loading Dock Upgrade – HN Balgowlah In line with Harvey Norman CEO, Katie Page’s ‘The Last Mile’ initiative, its retail complex at Balgowlah was in desperate need of an improvement of its physical assets and WHS standards for its on-site warehouse, its loading dock logistics and its associated customer service facilities, to enhance ‘The Last Mile’ delivery experience for their customers. Ozy Services was briefed by Harvey Norman Property to paint the ceiling of the loading dock and customer service areas, install 3-phase power across the warehouse and install 3 automated roller shutters and an in-fill panel and pedestrian door to provide an improved security option.